I have a situation that is a little off... We have a fractional t-1 being converted by an RLH Industries modules(Electrical to light) and then back again once into the power plant site and no one can advise me if the fractional t-1 is able to provide 24-48 vdc for powering these modules in the demarc box that is mounted on a pole.
Has anyone else had this type of situation?