I am needing to look up a date range of July, 21, 2011 through July 25, 2011 and if it is within that date range the material needs to match 068-GRD. If both of those criterias are met then I want Mat'l Qty to be summed.
Start Material Mat'l Qty
July 21, 2011 068-GRD 11.67
July 22, 2011
July 22, 2011
July 25, 2011
July 25, 2011
July 28, 2011
July 22, 2011 M-088-GRD 26.4
July 26, 2011
July 28, 2011
July 22, 2011 068-GRD 4.4
July 25, 2011
July 21, 2011 1659-GRD 301.14
July 27, 2011
August 2, 2011
August 3, 2011
August 5, 2011 1359-GRD 56.76
August 5, 2011
July 27, 2011 068-GRD 0.7
Start Material Mat'l Qty
July 21, 2011 068-GRD 11.67
July 22, 2011
July 22, 2011
July 25, 2011
July 25, 2011
July 28, 2011
July 22, 2011 M-088-GRD 26.4
July 26, 2011
July 28, 2011
July 22, 2011 068-GRD 4.4
July 25, 2011
July 21, 2011 1659-GRD 301.14
July 27, 2011
August 2, 2011
August 3, 2011
August 5, 2011 1359-GRD 56.76
August 5, 2011
July 27, 2011 068-GRD 0.7