sairaochowdary
Programmer
Hi everybody
I have very few doubts in below mentioned concepts.Anyone can solve my doubts.
1.can i have more than one fact table as data source to transformer.
2.is it possible to have different measures for different levels in single cube
3.is it necessary that impromptu be installed in the system which is using iqd as data source for transformer(i created iqd in one server in which i have impromptu installed and i copied the same iqd to another system which does not have impromptu installed on it,but i have transformer installed in it).can i create cube using that iqd even without impromptu installed on it.
4.what is meant by allocation in transformer.
Thanks
Sairaochowdary
I have very few doubts in below mentioned concepts.Anyone can solve my doubts.
1.can i have more than one fact table as data source to transformer.
2.is it possible to have different measures for different levels in single cube
3.is it necessary that impromptu be installed in the system which is using iqd as data source for transformer(i created iqd in one server in which i have impromptu installed and i copied the same iqd to another system which does not have impromptu installed on it,but i have transformer installed in it).can i create cube using that iqd even without impromptu installed on it.
4.what is meant by allocation in transformer.
Thanks
Sairaochowdary