Has anybody implemented or looked at event based scheduling of Powerplay Cubes? For example, start the cube load when a row on the source database is populated. Or start the load when a value is entered into the database table, such as a 'yes' flag to indicate the database jobs have finished.
Thanks,
Thanks,