Hi
I have a problem with a report which is called from an application developed in Delphi 5. We use the VCL and the report is developed in CR 8.5.
On my machine the report works fine but my colleagues get:
"Error 500 Not enough memory for operation".
We use the same Delphi app, database(Pervasive 8.6). Therefore my conclusion is that the error depends on some systemfile or Crystal-runtime file. But I cant figure out which.
Someone got a clue?
I have a problem with a report which is called from an application developed in Delphi 5. We use the VCL and the report is developed in CR 8.5.
On my machine the report works fine but my colleagues get:
"Error 500 Not enough memory for operation".
We use the same Delphi app, database(Pervasive 8.6). Therefore my conclusion is that the error depends on some systemfile or Crystal-runtime file. But I cant figure out which.
Someone got a clue?