Hi All,

Here is a weird one I hope someone might be able to help me on. I've e-mailed NAI Tech Support several days ago and I'm still waiting for a response.

After the recent Daylight Savings Time changeover, I am finding all of my schedule tasks created before October 27th are running one hour earlier than what i had scheduled. Tasks created now will run under the correct time.

If I type and view the logs from a random sampling, it appears a lot of my machines, if not all, are running 1 hour early. So I have a task set to run at 2:00 PM Local Time. When I check the logs using the web address above for each PC, the agent shows the task being executed at 1:00 PM.

The times on the client PCs and the ePO Server have the correct time and I can't think of anything else wrong.

Besides deleting all my tasks and recreating them, what else are my options? Did I forget to do something? Where is the task's scheduled time being checked from? (ePO Server, client PC, etc)

Thanks,

VictorySabre
 
You're not alone. My ePO console had the same 'feature'.
 
I just spoke with their tech support and it is a known issue and their Quality Assurance was aware of it. No hotfix will be available to fix and will be resolved by ePO 3.0.
 