Hi all,
I am making a overview of excel graphs for our production quality measurements. This overview should be a first basic monitoring of our quality results.
What I want to make is a graph with on the y-axis the result and on the x-axis the date. The date range should be 2weeks before "today" and automatically adjust the range by each day passing by.
What I tried to do but what didn't work, is making the cell code in the range formula e.g. dat in C1:C200 depended on a formula CC(COUNT(C:C)-14):C(COUNT(C:C))
But that didn't work.
I've read something about an offset formula but I don't fully understand.
Thanks
I am making a overview of excel graphs for our production quality measurements. This overview should be a first basic monitoring of our quality results.
What I want to make is a graph with on the y-axis the result and on the x-axis the date. The date range should be 2weeks before "today" and automatically adjust the range by each day passing by.
What I tried to do but what didn't work, is making the cell code in the range formula e.g. dat in C1:C200 depended on a formula CC(COUNT(C:C)-14):C(COUNT(C:C))
But that didn't work.
I've read something about an offset formula but I don't fully understand.
Thanks