krazeeddie
Technical User
I cannot find where to put in cost, but in reports there is a mi cost report. I have been working w/e7 10+yrs and was never asked for mi cost, help please.
this was a 3700 sys that crashed and was replaced w/e7
this was a 3700 sys that crashed and was replaced w/e7