sairaochowdary
Programmer
Hi,
We are using Cognos Impromptu 7 version.
Existing we have 2 Reports and they created 2 Packages for that reposts.they calling those packeges through Impromptu
stored procedure.they are passing 4 parameters for each report.In each package we have main query(Package and 4 parameters) and List Frame(sub report)(packge body)
existing we have 60 columns in each report and for this they created dummy catalog.
Now we going to Enhance those reports by adding extra 20 columns in each report.all these columns are in exiting Database Tables.
Question: Do we need to cange anything in cognos point view?
Except Package update.
We are using Cognos Impromptu 7 version.
Existing we have 2 Reports and they created 2 Packages for that reposts.they calling those packeges through Impromptu
stored procedure.they are passing 4 parameters for each report.In each package we have main query(Package and 4 parameters) and List Frame(sub report)(packge body)
existing we have 60 columns in each report and for this they created dummy catalog.
Now we going to Enhance those reports by adding extra 20 columns in each report.all these columns are in exiting Database Tables.
Question: Do we need to cange anything in cognos point view?
Except Package update.