Hello,
Main site 2 x8700 with #3 650 Gateways (Definity 3.x). DR site ESS -8500 with couple of gateways. Due to building power related work, we need to shutdown the mainsite gear (after the UPS runs out). Not planning for failover to DR site or anything. What is the recomended sequence of shut/unshut the Main site. Below is what I think works..
1. Shut the Standby server
2. Shut the Active.
3. Unplug gateway C, B, and A.
At this time DR ESS will send alerts. After the work, bring uo gateways (A,B and C) and then active server & stdby server.
ESS should automatically sync. The Trunks and call folw will be back to normal on Main site.
Will this work? Also, what are the recomended commnads to run at main site server to check the status of the system after power back.
Thanks in advance
MS
Main site 2 x8700 with #3 650 Gateways (Definity 3.x). DR site ESS -8500 with couple of gateways. Due to building power related work, we need to shutdown the mainsite gear (after the UPS runs out). Not planning for failover to DR site or anything. What is the recomended sequence of shut/unshut the Main site. Below is what I think works..
1. Shut the Standby server
2. Shut the Active.
3. Unplug gateway C, B, and A.
At this time DR ESS will send alerts. After the work, bring uo gateways (A,B and C) and then active server & stdby server.
ESS should automatically sync. The Trunks and call folw will be back to normal on Main site.
Will this work? Also, what are the recomended commnads to run at main site server to check the status of the system after power back.
Thanks in advance
MS