Hi all
Is there any way to change the date parameter to ask for the date in format DD-MM-YYYY instead of the default of YYYY-MM-DD

Thanks
Peter
 
Try File > Options > [Fields Tab] > [Date] and change the default. Though this will change all of the dates you add afterwards.

It helps to give your Crystal version - 8, 8.5, 9, 10, 11 or whatever. Methods sometimes change between versions, and higher versions have extra options.

[yinyang] Madawc Williams (East Anglia, UK). Using Windows XP & Crystal 10 [yinyang]
 
Madawc
tried that but the parameter still says yyyy-mm-dd.

Crystal version is XI

Thanks Peter
 
I don't believe there is a way to change that.