SmokeEater
Technical User
I have Crystal Reports 9 Advanced. It ships with RAS and Crystal Enterprise Standard. The RAS has a queing ability that the CE lacks, after 5 concurrent connections you get a web error. Is there any way to combine the two so that the scheduling capability of CE can be used in conjunction with the queing capability of the RAS?