italianjoe69
MIS
Basically I have 2 groups that I would like to alternate the Sat's that they run. I need to create 2 schedules to do a full every other Sat. These 2 schedules need to be opposite of each other. How can I create these without having to manually hit each Sat of each month? Is it possible?
Looking at the properties for the schedule I tried typing in 'full every other sat every month' in the overrides box but it didn't like it.
So far ...
For one schedule I have:
full second sat every month
full fourth sat every month
For the other I have:
full first sat every month
full third sat every month
full fifth sat every month
This works for a while, but I do run into 2 x 2 weeks that the same schedule gets skipped and 2 x 2 weeks where the same schedule runs a full.
TIA
Joe
Windows Technical Services
Backup Administrator
Looking at the properties for the schedule I tried typing in 'full every other sat every month' in the overrides box but it didn't like it.
So far ...
For one schedule I have:
full second sat every month
full fourth sat every month
For the other I have:
full first sat every month
full third sat every month
full fifth sat every month
This works for a while, but I do run into 2 x 2 weeks that the same schedule gets skipped and 2 x 2 weeks where the same schedule runs a full.
TIA
Joe
Windows Technical Services
Backup Administrator