ThePhoneGURU
Technical User
Hey All,
Just took over a customer w/CICS 6.0 fully blown 8X24
They have CP100 w/20 mail 20 unified.
I was hired to add a couple of sets on the system and found that only one VM port was punched down to the system on DN 236 port 116. I explained to the customer he was only working off of two channels.
My question is, I would like to terminate a second rj11 to port B of CP100, but port 117/237 is the ATA port.
I was then thinking to reterminate port A of CP100 onto port 118/dn 238 and port b onto port 119/239.
Here's the question: Right now the CP100 was installed on DN 236, will it recognize the change if I change the port number to 118 and 119 and reboot? My guess would be no..Or should I disable (XFTEST) all the F98 codes and then reboot? Will I lose keycodes (as the customer doesn't have them) Will I need to redo the whole VM?
Me and my big mouth.....
Thanks for reading the long winded question..its late..
Just took over a customer w/CICS 6.0 fully blown 8X24
They have CP100 w/20 mail 20 unified.
I was hired to add a couple of sets on the system and found that only one VM port was punched down to the system on DN 236 port 116. I explained to the customer he was only working off of two channels.
My question is, I would like to terminate a second rj11 to port B of CP100, but port 117/237 is the ATA port.
I was then thinking to reterminate port A of CP100 onto port 118/dn 238 and port b onto port 119/239.
Here's the question: Right now the CP100 was installed on DN 236, will it recognize the change if I change the port number to 118 and 119 and reboot? My guess would be no..Or should I disable (XFTEST) all the F98 codes and then reboot? Will I lose keycodes (as the customer doesn't have them) Will I need to redo the whole VM?
Me and my big mouth.....
Thanks for reading the long winded question..its late..