Configuration :
- workload TNG 3.0 on windows 2000
Definition :
- I have defined a trigger with in the profile tab a holiday calendar named "Holidays"
- In the conditions field condition "FOMWEEK"
Question :
- how can i verify (like the command schdfore for the job) that the trigger would be elligible in the future
Thank's for helping me
- workload TNG 3.0 on windows 2000
Definition :
- I have defined a trigger with in the profile tab a holiday calendar named "Holidays"
- In the conditions field condition "FOMWEEK"
Question :
- how can i verify (like the command schdfore for the job) that the trigger would be elligible in the future
Thank's for helping me