I'm using CR10 and CE10 Express, and I'm getting conectivity errors on all reports with parameters when I try to run them under the schedule tab. However, if I go to the preview tab, they run fine. I entered default dates in the parameter tab prior to running the report, then sheduled them to run now. The status comes back as success, but when you click on the newly created instance, it prompts for parameters again, then I get an "Unable to connect: Incorrect log on parameters on cache/page server". I recently changed the data source on the reports from a test server to a production server, and I know that CE servers are pointed to the test server. I am assuming there is a conflict in the page server when the parameters are passed. Do I need to reconfigure all the servers in CE to point to the prod server, or will changing just the page server do the trick??