AvayaNovice
Vendor
Does the conduit fill ratio rule apply to stubs? Ie. a 2' stub (or chase) going from the cieling space, through the cieling tiles, and just a few inches down, basically allowing a path for your cabling to go from above the cieling down into the MDF or IDF. I've done it with 4" PVC a bunch of times, and since they're usually only a foot or two long, I fill them up pretty full so as to not have to have too many. Any standards info on this?
Also, are there any defined standards on whether or not flex requires a plastic bushing, or no?
Also, are there any defined standards on whether or not flex requires a plastic bushing, or no?