Hi,
Is there a way (in macola) to capture time and 1/2 on a shop floor?
Currently, any hours worked on a Friday (which is OT) are entered under a separate operation #, then when it's time to close that shop floor, all of the hours under that operation would be multiplied by 1.5. I was just wondering if there was a way to automatically have Friday's hours (for any employee) or hours collected under a specified operation #, generated as 1.5 on the summary cost analysis.
Thanks in advance.
D
Is there a way (in macola) to capture time and 1/2 on a shop floor?
Currently, any hours worked on a Friday (which is OT) are entered under a separate operation #, then when it's time to close that shop floor, all of the hours under that operation would be multiplied by 1.5. I was just wondering if there was a way to automatically have Friday's hours (for any employee) or hours collected under a specified operation #, generated as 1.5 on the summary cost analysis.