mikecollett
Technical User
for the life of me i cant work this one out!
i have a simple little table that has a date and a number that i want to chart.
i have a simple little select query (date range specified in a form) to select my data. no calc required.
i have a simple little line chart on a simple little report that shows the *beep* dates in long format when i want short format.
formatting the axis does not work.
detail section, event, on format,do events trick does not work.
a little history that may have wonked it up;
the table was originally general date format. i have changed it to short.
the form used Now() and Now()-100 for date range for default values. is now 01/01/03 and user type in other. both short date format.
query is short date format.
query behind the graph is also short date format.
every *beep* thing i can find i have set to short date.
it still pulls through the *beepity beeping* general format (date and time - i only want the date!!!!)
please help - i am at my wits end!
mike c
ps i have done some really fancy stuff before in these graphs so this simple little thing is really driving me nuts
i have a simple little table that has a date and a number that i want to chart.
i have a simple little select query (date range specified in a form) to select my data. no calc required.
i have a simple little line chart on a simple little report that shows the *beep* dates in long format when i want short format.
formatting the axis does not work.
detail section, event, on format,do events trick does not work.
a little history that may have wonked it up;
the table was originally general date format. i have changed it to short.
the form used Now() and Now()-100 for date range for default values. is now 01/01/03 and user type in other. both short date format.
query is short date format.
query behind the graph is also short date format.
every *beep* thing i can find i have set to short date.
it still pulls through the *beepity beeping* general format (date and time - i only want the date!!!!)
please help - i am at my wits end!
mike c
ps i have done some really fancy stuff before in these graphs so this simple little thing is really driving me nuts