Hi All,
Just looking for a little confirmation on the steps to swap out an SDI card. I'm moving from a Dual to a Quad SDI Paddle Board. Here are the steps if I remember correctly:
LD 37
Dis tty 2 and 3(TTY 2 is the XSM)
Hard ware disable the Dual SDI Paddle Board and Remove.
Fuzzy Part:Do I need to out those TTY's before I seat the New Quad SDI Paddle Board in the PBX or can I do this after I put in the new card?
LD 37
enl tty 0(new XSM tty)
enl tty 1(replaces tty 3)
Dip switches on the new SDI Card are already configured .
Thanks for the help!
Just looking for a little confirmation on the steps to swap out an SDI card. I'm moving from a Dual to a Quad SDI Paddle Board. Here are the steps if I remember correctly:
LD 37
Dis tty 2 and 3(TTY 2 is the XSM)
Hard ware disable the Dual SDI Paddle Board and Remove.
Fuzzy Part:Do I need to out those TTY's before I seat the New Quad SDI Paddle Board in the PBX or can I do this after I put in the new card?
LD 37
enl tty 0(new XSM tty)
enl tty 1(replaces tty 3)
Dip switches on the new SDI Card are already configured .
Thanks for the help!