Our system is currently on the 3-digit Numbering Plan. We currently have 60 extensions in our system (16 Digital and 34 Analog).
I plan on adding an expansion cabinet. When I do I want to re-arrange the modules and add more Digital Lines. I know that if I re-arrange the modules I will have to do a System Renumber and reprogram many of the extension. So I want to change the Numbering Plan to Set-Up Space at this time as well.
When I do this, can I do all of the reprogramming with the SPM or does some of it have to be done at the Console?
I plan on adding an expansion cabinet. When I do I want to re-arrange the modules and add more Digital Lines. I know that if I re-arrange the modules I will have to do a System Renumber and reprogram many of the extension. So I want to change the Numbering Plan to Set-Up Space at this time as well.
When I do this, can I do all of the reprogramming with the SPM or does some of it have to be done at the Console?