I need to modify the way a report is ordered. The report was originally made by someone else using the Report Wizard. I cannot seem to find the Order By fields for the report. Is there a way to access these fields on a report that was made with a wizard?
Information is not Knowledge, Knowledge is not Wisdom, Wisdom is not Truth, Truth is not Beauty, Beauty is not Love, Love is not Music, Music is the best.
Information is not Knowledge, Knowledge is not Wisdom, Wisdom is not Truth, Truth is not Beauty, Beauty is not Love, Love is not Music, Music is the best.