Jul 26, 2001 #1 aevans Technical User Jul 25, 2001 11 AU Can u stop a scheduled report once is starts processing? And secondly, can u stop an on-demand report if u accideantally opened it and realized it was a report that takes 30 to run. Alexander
Can u stop a scheduled report once is starts processing? And secondly, can u stop an on-demand report if u accideantally opened it and realized it was a report that takes 30 to run. Alexander
Jul 27, 2001 #2 AEldridge Vendor Jul 10, 2001 70 AU I don't believe this is possible in the current release of CE. Hopefully this will be included in a future release. Cheers, Alan Eldridge Melbourne, Australia Upvote 0 Downvote
I don't believe this is possible in the current release of CE. Hopefully this will be included in a future release. Cheers, Alan Eldridge Melbourne, Australia