Maxwell1001
Vendor
System 406v1
3.1 (DS Phones)
every night when reports are run the customer is getting a message in CCC reporter saying
" a crystal report job failed because a free license could not be obtained in the time allocated"
Any one seen this, if i restart the Reporting service before leaving work which is before the reports run then this does not occur.
I know we can edit the bacth file and have it schedueld to run but this is not ideal, also can not be upgraded because a V1 406, done a repaire install of CCC
thanks in advance
ACA - IP Office
ACS - IP Office
ACSS-SME
3.1 (DS Phones)
every night when reports are run the customer is getting a message in CCC reporter saying
" a crystal report job failed because a free license could not be obtained in the time allocated"
Any one seen this, if i restart the Reporting service before leaving work which is before the reports run then this does not occur.
I know we can edit the bacth file and have it schedueld to run but this is not ideal, also can not be upgraded because a V1 406, done a repaire install of CCC
thanks in advance
ACA - IP Office
ACS - IP Office
ACSS-SME