Hi all,
This may be completely off the wall so please bear with me. I have two different save groups. I want one to begin at 9pm while the other to begin at 11pm. The problem is that by the time the 11pm job starts, the 9pm job will have used both drives in the library to do its thing which will force the 11pm job to wait. Is it possible to tell the 9pm job to "use only this drive for the job" so the other drive will be free for the other save group?
Hope this makes sense. Thanks for your time.
-C
This may be completely off the wall so please bear with me. I have two different save groups. I want one to begin at 9pm while the other to begin at 11pm. The problem is that by the time the 11pm job starts, the 9pm job will have used both drives in the library to do its thing which will force the 11pm job to wait. Is it possible to tell the 9pm job to "use only this drive for the job" so the other drive will be free for the other save group?
Hope this makes sense. Thanks for your time.
-C