Please toss me a bone here.
I've been working with Veritas for SIX months on this. They can't seem to fix it.
Everything else works except calendar based backups on the following system:
Dell Poweredge 2500, 2X1.0GHz Proc, 2GB RAM, tons of disk.
Quantum|ATL P3000 tape library with 6 IBM LTO-1 drives.
Redhat 7.3
Veritas Datacenter 4.5mp1,2&3 all tried and failed.
Absolutely nothing shows up in the logs when the schedule is supposed to run. It doesn't even try to run.
I've also tried this on a completely different cpu/tape-robot and they haven't worked either.
Any info would be appreciated.
Thanks,
Mark Sleeper
mark.sleeper@noaa.gov
I've been working with Veritas for SIX months on this. They can't seem to fix it.
Everything else works except calendar based backups on the following system:
Dell Poweredge 2500, 2X1.0GHz Proc, 2GB RAM, tons of disk.
Quantum|ATL P3000 tape library with 6 IBM LTO-1 drives.
Redhat 7.3
Veritas Datacenter 4.5mp1,2&3 all tried and failed.
Absolutely nothing shows up in the logs when the schedule is supposed to run. It doesn't even try to run.
I've also tried this on a completely different cpu/tape-robot and they haven't worked either.
Any info would be appreciated.
Thanks,
Mark Sleeper