Part of my Db is a time clock type system in which my employees "clock in" and "clock out" of lunch and the workday. Is there a way that I can work with these timestamps (formatted as HH:MM) where I can calculate sums with the existing data? Being that it is base on 60 minutes to the hour I am having some trouble with this.
Thank You,
Jimenda
Thank You,
Jimenda