I'm having some trouble with my brick level exchange mailboxes job. I use staging and if the job is incomplete (ie missed mailbox)It will not copy from staging to tape. I've looked over all of the settings and compared them to my other staging jobs that do copy over incomplete jobs and I see no difference. Em I missing something obvious or is this just not possible.
Arcserve 11.5 sp3
windows 2003
Arcserve 11.5 sp3
windows 2003