Dec 15, 2004 #1 beltic IS-IT--Management Sep 2, 2004 5 US Ok, Im stumped.. hehe. Im sure there is an easy way to get this done, but.. when doing schematics, I have a need for the line dimensions to be ABOVE the line, rather than splitting the line itself. What am i missing?
Ok, Im stumped.. hehe. Im sure there is an easy way to get this done, but.. when doing schematics, I have a need for the line dimensions to be ABOVE the line, rather than splitting the line itself. What am i missing?