natashiakk
Technical User
I am trying to create the DR CD for Disaster Recovery. On the wizard, it indicate that a full backup on the server must be perform first before creating the DR Image.
I have 2 BE9 server - does it mean that I need to create the CD for each server. Can I just share the same bootable CD.
thx
nat.
I have 2 BE9 server - does it mean that I need to create the CD for each server. Can I just share the same bootable CD.
thx
nat.