I've got a PE 2500 on Windows 2000 Server with Array Manager V3.1....
I just received a message that the PERC 3/Di Controller Battery needs recharging. I know how to do this from within the Array Manager but in doing some research it looks like the recharge process takes anywhere from 8 to 10 hours and should be done in off peak times due to the cache being turned off. Before I call Dell and wait a day and a half to talk with anyone, does anyone know how to run this as a Scheduled Task? Thanks.
I just received a message that the PERC 3/Di Controller Battery needs recharging. I know how to do this from within the Array Manager but in doing some research it looks like the recharge process takes anywhere from 8 to 10 hours and should be done in off peak times due to the cache being turned off. Before I call Dell and wait a day and a half to talk with anyone, does anyone know how to run this as a Scheduled Task? Thanks.