Hi all,
The problem I have might be a simple one for you pros out there.
I have a daily back-up job schedule started which back-ups daily except on Saturdays and sundays. If I want to restore from a certain date, I would have to select the job by the tape serial number. I would like to select the job by the date it was backed-up rather than the serial number.
The only date given in the 'Restore Selections' window is that date when the job was created (Feb 19). I want that to be a variable date which updates daily.
Any tips or pointers would be appreciated.
Troy
The problem I have might be a simple one for you pros out there.
I have a daily back-up job schedule started which back-ups daily except on Saturdays and sundays. If I want to restore from a certain date, I would have to select the job by the tape serial number. I would like to select the job by the date it was backed-up rather than the serial number.
The only date given in the 'Restore Selections' window is that date when the job was created (Feb 19). I want that to be a variable date which updates daily.
Any tips or pointers would be appreciated.