Can anyone shed any light on this issue:
Using Arcserve 2000 on with NWAgent Novell 4.11 our backups take 1/2 hour one night and then 5 hours the next. There is nothing changing from the one time to the next. But the longer backup time throws off other scheduled events.
thanks
Using Arcserve 2000 on with NWAgent Novell 4.11 our backups take 1/2 hour one night and then 5 hours the next. There is nothing changing from the one time to the next. But the longer backup time throws off other scheduled events.
thanks