curtjohnson
Technical User
When I schedule a job in BE 8.0 the job goes to "hold" right away. I've checked the history (renamed the dir.), reloaded the software, deleted the Que. I can rewind the tape and eject the tape. I ran tests from the scheduler and it passes. Still goes to hold. I'm thinking of deleting the software and reinstalling. Does anybody have any other ideas? I am using Netware 4.11 SP 7.