Nov 7, 2000 #1 jfigueroa MIS Nov 7, 2000 1 US Is there a way to execute a Backup Exec job that will tell me what files will be deleted from a file grooming job, before doing the actual delete?. Sort of a simulation or Report option that've seen in other products. Thanks in advance.
Is there a way to execute a Backup Exec job that will tell me what files will be deleted from a file grooming job, before doing the actual delete?. Sort of a simulation or Report option that've seen in other products. Thanks in advance.