I'm just starting off in the AS path and was hoping someone can help with a speed poser. I have 2 cubes (one normal measures the other a Distinct Count) which both have calculated measures (OpeningPeriod for a time dim)
These 2 cubes are then combined into a Virtual cube, on which I have also imported all the calc measures. My question is, do I now need the calc measures in the normal cubes? Will duplicating the measures cause the query of the cube to slow down (via Excel 2003 Pivot/Getdata)