We are in the unique situation of having moving data centers. Whenever we are required to change the time zone on our servers to match the location of the data center, Arcserve automatically reschedules the job according to the time zone change, i.e. we change the time zone by one hour, Arcserve changes the backup job by one hour. After talking to CA, they indicated that this was by design, but are unable to correct it. We want the job to run at the original time scheduled. We have run into this issue with both ArcServe 2000 and Brightstor 11. Anyone have any ideas?