Hi,
I have dly, wkly and mthly media pools created.
I am backing up approx 20 servers across 4 LTO tapes in a library for each nights backup.
My problem is that I backup one system to a tape and then the tape gets moved to a save set even though my next backup job is an append job. The 2nd backup job just uses a new tape.
This means that my tapes don't get utilised correctly.
How can I make sure that the first tape is full before backing up to the next tape?
Thanks,
Ronnie
I have dly, wkly and mthly media pools created.
I am backing up approx 20 servers across 4 LTO tapes in a library for each nights backup.
My problem is that I backup one system to a tape and then the tape gets moved to a save set even though my next backup job is an append job. The 2nd backup job just uses a new tape.
This means that my tapes don't get utilised correctly.
How can I make sure that the first tape is full before backing up to the next tape?
Thanks,
Ronnie