I have 2 80/160/ DLT drives and 6 jobs that run daily.
We were running the jobs as follows:
Drive1
Job1
Job2
Job4
Job5
Job6
Drive 2
Job3
Jobs 1,2,4,5,6 accounted for approx 38GB and Job 3 has now larger than a single tape, it needs about 3GB of space to finish (approx 110GB total)
I created a drive pool with both Drive 1 & 2 and set all the above jobs to use this pool knowing that Drive 1 has plenty of room after running all the other jobs.
Problem
Everything goes fine and the larger jobs does wait until drive 1 is avaialbe then continues as expected BUT all the jobs that were on that tape are gone.
I confirmed that Job 3 is set to "Append to media, terminate if no appendable media is availabe." I am guessing that this only applies when the job starts but when it moves to the next tape it overwrites?
We were running the jobs as follows:
Drive1
Job1
Job2
Job4
Job5
Job6
Drive 2
Job3
Jobs 1,2,4,5,6 accounted for approx 38GB and Job 3 has now larger than a single tape, it needs about 3GB of space to finish (approx 110GB total)
I created a drive pool with both Drive 1 & 2 and set all the above jobs to use this pool knowing that Drive 1 has plenty of room after running all the other jobs.
Problem
Everything goes fine and the larger jobs does wait until drive 1 is avaialbe then continues as expected BUT all the jobs that were on that tape are gone.
I confirmed that Job 3 is set to "Append to media, terminate if no appendable media is availabe." I am guessing that this only applies when the job starts but when it moves to the next tape it overwrites?