Hi,
I’m using Analysis Studio, In order for me to drill-through from 1st cube (summary) to a 2nd cube (detail) do I have to build a report from a 2nd cube so i can drill-through to that report or I can just drill through to the cube without building a report of the 2nd cube?
Thank-you
I’m using Analysis Studio, In order for me to drill-through from 1st cube (summary) to a 2nd cube (detail) do I have to build a report from a 2nd cube so i can drill-through to that report or I can just drill through to the cube without building a report of the 2nd cube?
Thank-you