Can I add task name to the milestone bar to the left as the date is automatically placed to the right.
I have set up a column "Text 1" and copied the task names into it and have set the bar text up to display Text 1 to the right. Now I have made a second column "Text 2" but I can not get it to display to the left of the milestone.