I am trying to create a chart and in that chart is the summary of variables. When I go to my preview page I get the message "A print time formula that modifies variables in used in a chart or map".

I assume I am getting this sine I have formulas with variables calculating whileafterprinting as well as formulas with evaluateafter(@variables). Is there a way to tell the chart to evaluateafter a certain formula?
 
Thanks for the link. I went through the steps and adjusted them a bit to suit my report, but it does not create a chart. I'm not sure if it's because I have 2 OnChange formulas and 2 ShowValue formulas. Also, I need one chart per Group One (I have 3 groups), so I adjusted the steps to match this as well.....I'm just not sure if I did that right either.

Another question I have is, how do I tell the report that if a variable is equal to 0.00, drop that group from the report. I tried to do a group selection, but because it's a variable, it won't let me. I tried adding evaluaterafter, but that didn't work either.
 