Does anyone know if Enterprise 8.5 has a "date" section for the run Once option in scheduling a report. I have users that often want the report to run the next, or even next week after a particular event has happened.
i.e Database people schedule a load for 10:00 to 10:30 Sunday night.
analysts want to run the reports at 10:30pm then Monday 2:00am then 5 am to check on processing. Right now they can't set these on Friday.
Anyone else with this problem?
Lisa
i.e Database people schedule a load for 10:00 to 10:30 Sunday night.
analysts want to run the reports at 10:30pm then Monday 2:00am then 5 am to check on processing. Right now they can't set these on Friday.
Anyone else with this problem?
Lisa