I want to create an ActiveX control that will display my has a data in a manufacturing calendar with the dates down the left hand side, the manufacturing plants along the top and all the jobs per date per plant as the 'values'.
eg.
Plant 1 Plant 2 Plant 3
Monday 1 Dec 2002 Job 1 Job 1
Job 2 Job 2
Job 3
Tuesday 2 Dec 2002 Job 1 Job 1 Job 1
Job 2 Job 2
Job 3
I then want to be able to drag Plant 2's job 1 on Tuesday to Plant 1 on Monday.
I tried the Heirachial FlexGrid control which displays my data nearly like I want it but that control doesn't accept drag and drop. Anybody out there done this before so I don't have to re-invent the wheel?
eg.
Plant 1 Plant 2 Plant 3
Monday 1 Dec 2002 Job 1 Job 1
Job 2 Job 2
Job 3
Tuesday 2 Dec 2002 Job 1 Job 1 Job 1
Job 2 Job 2
Job 3
I then want to be able to drag Plant 2's job 1 on Tuesday to Plant 1 on Monday.
I tried the Heirachial FlexGrid control which displays my data nearly like I want it but that control doesn't accept drag and drop. Anybody out there done this before so I don't have to re-invent the wheel?