Hi all,
We are trying to migrating existing ACCS 6.4 to the ACCS 7.0, all data are restored correctly to the new ACCS, however, we plan to do only the restore of historical reporting the day before go live date, is this possible ?
Please could you tell me how to do it with ACCS (without retoring other configuration...)?
Thank you in advance.
We are trying to migrating existing ACCS 6.4 to the ACCS 7.0, all data are restored correctly to the new ACCS, however, we plan to do only the restore of historical reporting the day before go live date, is this possible ?
Please could you tell me how to do it with ACCS (without retoring other configuration...)?
Thank you in advance.