What I do is to first export Project to Excel. Examine the format and create something similar in Access. Dump it to Excel and import into Project. I haven't got it sorted yet - Project expects the different levels to be clumped into the same column (with a level field). So I need bit of manual editing but it still saves hours over trying to re-enter data from scratch.