Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations SkipVought on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

6509 Upgrade

Status
Not open for further replies.

xdxml12

Technical User
Oct 26, 2012
24
0
0
AE
We are purchasing a second core switch and want to have them in a VSS cluster. Both 6509. However- the old 6509 has an older sup and we are upgrading the sup as well to the sup2t. Can we upgrade to sup2t without restating the 6509?

To minimize downtime as much as possible. This is what I had in mind and would appreciate any input.

1.Setup new switch with hsrp and vss.
2.Ensure root bridge is still the old 6509, and using rspt.
3. Connect switches together
4. Remove old switch, should fail over to new switch
5.Upgrade old switch
6. Turn off hsrp on new switch
7.Turn off hsrp on old switch
8. Enable vss on second switch
9. Connect old switch back in

Any advise or comments or pitfalls I need to watch out for?

Thanks in advance.
 
Hi,

I have never tried to upgrade the supervisors while running so you can give that a shot and let us know how it goes. Alternatively, since you are taking it out of production you can save the config, power it down, replace supervisors, power up, copy config to new sups without any issues.

I would also check to make sure all line cards will be compatible with the new sups.

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top