What pair do i start with? I am punching it down two two 24 port patch panels. I have both female telco cables routed in my rack ready to punch down. I want to know which pairs are going to be used? 16 per bus. So is it standard or the first 16, or the last 16? I have the guide for the main bcm 50 unit, but that one leaves a pair out, should I follow that chart? Thank you in advance.
Tony
Tony