Quick Question
For a interim period I need to install a copy of Windows 2003 Ent Server R2 Eval onto my domain for some testing and this will be removed within the trial period.
Silly question is will the 180 eval affect anything else in the domain i.e time bomb the rest of the servers with the 180 days ?
Any help would be appreciated as need to join domain by end of week
Thanks
Dave
For a interim period I need to install a copy of Windows 2003 Ent Server R2 Eval onto my domain for some testing and this will be removed within the trial period.
Silly question is will the 180 eval affect anything else in the domain i.e time bomb the rest of the servers with the 180 days ?
Any help would be appreciated as need to join domain by end of week
Thanks
Dave