  1. galeena

    Visio and Postgres

    is it possible to generate a postgres database with Visio EA?I have the psqlodbc driver installed on my computer however Visio does not have a postgres driver. So I have to generate the script using the Generic ODBC driver which is not compatible with Postgres. How can I make Visio generate...
  2. galeena

    Create a relationship between two entities on different pages

    In the "Database Model Diagram", how can I create a relationship between two entities if they are located on separate pages in the Model? Is there a way to place all your objects on one page and then increase the size of the page? or is there a way to create relationships other than graphically...
  3. galeena

    Resource workload constraints donot affect task dates!!

    If you read my posting carefully you will notice that I m looking for a place where I can configure MS Project to do what I expect from it. "Is there a way where I can set MS project to do this checking and consequently changing the start dates of some tasks according to the resources...
  4. galeena

    Resource workload constraints donot affect task dates!!

    If I have two tasks A and B and I want to assign them to Marc. Both are actually independent tasks and if we have enough resources they could be done in Parallel. When I chose Task StartDate EndDate Resources A 2004/01/13 2004/01/16 Marc(100%) B...